How We Work

Our New Construction Workflow

Our streamlined Drywall Installation process keeps your job site moving.

  • Phase 1: Precision Hanging

    Expert installation of high-volume sheetrock, including moisture-resistant and fire-rated (Type X) boards for multifamily builds

  • Phase 2: Tape & Bed Mastery

    Multiple coats of joint compound applied with precision to ensure structural durability and seamless transitions.

  • Phase 3: Custom Finishing

    From modern knockdown textures and orange peel to high-end Level 5 smooth wall finishes for luxury residential units.

  • Phase 4: Specialty Systems

    Professional installation of acoustic grid ceilings and specialized framing for light commercial interiors.

Scalable Services for Builders & Developers

From single-family custom home to large-scale multifamily developments.

  • Multifamily Developments

    Reliable crews capable of handling high-density apartment and condo projects.

  • Custom Residential

    Specialized hand-applied textures and premium finishes for custom home builders.

  • Light Commercial

    Metal stud framing, fire-rated assemblies, and drop ceilings for retail and office shells.

  • Remodels & Additions

    eamlessly blending new construction with existing structures.

Quotes

Contact us to discuss your project or get a quote. Our team is ready to provide you with top-quality service and answer any questions you may have.

Frequently Asked Questions About Drywall Services

A Level 4 finish is the industry standard for most residential homes where a texture (like orange peel or knockdown) will be applied. It involves three coats of joint compound over joints and fasteners. A Level 5 finish is a premium service that includes a final skim coat over the entire wall surface. This creates a “museum-quality” smoothness, ideal for high-gloss paints and areas with intense, direct lighting.

The timeline depends on the square footage, but a standard new construction drywall project usually takes between 5 to 10 days. This includes hanging the sheetrock, taping and bedding (which requires drying time between coats), texturing, and final cleanup. We provide detailed schedules for our multifamily and commercial projects in Fort Worth, Houston, and San Antonio to keep your build on track.

Traditional popcorn removal is notoriously messy, but our professional process minimizes the impact on your home. We use heavy-duty plastic masking to protect floors and furniture, and specialized scraping tools to contain dust. Once removed, we can refinish your ceiling with a modern texture or a smooth Level 5 finish to instantly increase your home’s resale value.

Yes. Texture matching is one of our specialties. Whether your home has a specific hand-applied skip trowel, a spray knockdown, or a standard orange peel finish, our experienced contractors use specialized techniques to ensure the repaired area blends seamlessly with the rest of the wall

If your home or commercial building was constructed before the mid-1980s, it is highly recommended to have the acoustic texture tested for asbestos. At Texan Drywall, we prioritize safety and can guide you through the testing process to ensure your renovation is compliant with Texas safety regulations

Absolutely. We are a turnkey drywall contractor equipped to handle large-scale multifamily developments, light commercial offices, and retail build-outs. With locations in Fort Worth, Houston, and San Antonio, we have the manpower and resources to manage high-volume projects while maintaining strict quality control.

Drywall cracks are often caused by foundation settling, temperature fluctuations, or poor initial installation. Our team doesn’t just patch the crack; we inspect for underlying issues like moisture or structural movement to ensure the repair is a long-term solution rather than a temporary fix. maintaining strict quality control.

Drywall Finishes 101

Level 1

Attics, Garages, Utility Rooms

What's Done

Joints taped only – No mud or sanding. Tape embedded in mud.

Surface Appearance

Rough, visible tape, open joints

Typical Use

Temporary construction, attics, garages, utility areas, behind tile

Paint Ready?

NO

Level 2

Garages, Warehouses, Basements

What's Done

Tape embedded in mud – One coat over tape and fasteners – No sanding (or very light). Tape embedded in mud.

Surface Appearance

Visible seams and fasteners

Typical Use

Garages, warehouses, behind wall panels, some basements

Paint Ready?

NO

Level 3

Standard for Most Homes

What's Done

One additional coat over joints and fasteners – Light sanding. Tape embedded in mud.

Surface Appearance

Smoother but seams still noticeable.

Typical Use

Texture finishes (knockdown, orange peel, popcorn).

Paint Ready?

Not for smooth paint.

Level 4

Custom Home Smooth Finish

What's Done

Two coats over joints and fasteners – Sanded smooth. 

Surface Appearance

Smooth to the touch; seams may show in harsh light.

Typical Use

Custom Home Smooth Finish

(bedrooms, living rooms, ceilings).

Paint Ready?

Yes (flat, eggshell, satin best).

Level 5

High-End Homes & Finishes

What's Done

Level 4 finish plus Full skim coat over entire wall/ceiling – Final sanding.

Surface Appearance

Uniform, ultra-smooth, no visible seams.

Typical Use

High-end homes, glossy paint, lots of natural light, accent walls.

Paint Ready?

Yes (including semi-gloss & gloss).